Renovation And Fit Out

£180K dilapidation strip out and subsequent turnkey fit out for third sector client in Dumfries town centre.

This project encompassed the complete ground to roof renovation of a traditionally built sandstone property across two floors.  The works were carried out to the architect specification and to a set programme dictated to by the client’s move in date.  Works were both internal and external and in a sympathetic manner given the property’s location on a busy town centre street. 

Demolition:  Strip out of all existing fixtures and fittings · Removal of bird waste and subsequent chemical clean · Removal and disposal of cement asbestos roof · Removal and disposal of failed concrete floor · Full electrical strip out

Building:  Casting of new concrete floor · Natural stone preservation repairs · Preparation and repair of badly weather external random natural stone walls · Installation new cement lintols to replace failed natural stone · Formation of window and door openings to both internal and external walls

Steelwork:  Installation of structural column and beam steels · Manufacture and installation of steel fire escape stair case

Roofing:  Installation of polycarbonate roofing system · Extensive repair work to traditional slate pitched roofs · Replacement of failed lead flashings and gutters · Installation of roof void ventilation · Installation of new built up felt roofing system

Joinery:  Timber repairs and replacement of rotten structural timbers to floors and roof trusses · Formation and installation of new floor and roof structural timbers · Installation of new sound proofed timber stud partitions · Installation of new suspended ceilings · Installation of new timber door sets · Manufacture and installation of new traditional timber windows · Glazing repairs · Installation of fitted kitchen

Plumbing:  Installation of new DCWS and DHWS · Installation of new drainage supplies including connection into public drainage network · Installation of new disabled, male, and female welfare facilities including all associated pipework

Electrical:  Installation of new electrical distribution equipment · Installation of new field wiring · Installation of new electrical fixtures and fittings · Installation of new ventilation system

Data and Telecommunications:  Installation of all distribution, field wiring, and fixtures to meet client specification

Decoration:  Ames taping and filling · Full internal decoration · External decoration

Soft Finishes:  Preparation and installation of all vinyl and carpet floor coverings · Installation of client furniture and fixtures